Holmen logotype Holmen logotype

Blåbergsliden Wind Farm

Blåbergsliden's wind farm is located on Holmen's land outside Skellefteå. The wind farm comprises 26 wind turbines.

Blåbergsliden Wind Farm

The wind farm in Blåbergsliden is located about 40 kilometres southwest of Skellefteå. Construction of the wind farm began in April 2020 and the first turbine was commissioned in November 2021. The facility was fully completed in May 2022.

The 26 wind turbines are estimated to have an annual energy production of just over 400 GWh, which is equivalent to electricity for about 100,000 households each year. A total of nine kilometres of new road have also been built and thirteen kilometres of existing road have been reinforced and widened.

About the wind farm

Place: Blåbergsliden, Burträsk, Skellefteå Municipality

Project area: 1,200 hectares

Wind turbines: 26 General Electric GE-158 Cypress (5.5 MW)

Total height: 199.5 metres

Maximum power: 143 MW

Approximate annual production: 400 GWh 

Holmen's shareholding: 100 per cent

Commissioning: 2021

Grid connection: 150kV Skellefteå Kraft Elnät AB

About the website

  • Cookies
  • Change your cookie settings
  • Personal data (GDPR)


Holmen logotype

Renewable Energy is part of the Holmen Group, developing and managing the Group’s hydro and wind power operations. As a major landowner, Holmen has great potential to develop new wind power projects. Through strategic partnerships, Renewable Energy facilitates investments and start-ups in the areas of wind power and property development on the Group’s land.

Övervakningsplan elnät

Elnätstariff 2023

Holmen Group websites

  • Holmen Group - holmen.com
  • Forest - holmen.com/forest
  • Renewable energy - holmen.com/energy
  • Board and Paper - holmen.com/boardandpaper
  • Wood Products - holmen.com/woodproducts

More about the Holmen Group

  • About Holmen
  • Career
  • Sustainability
  • Investors
  • Newsroom

© Holmen 2025